OPTIMIZATION OF NONCONVENTIONAL WELLS UNDER UNCERTAINTY USING STATISTICAL PROXIES
- DSpace Home
- →
- Геология России
- →
- ELibrary
- →
- View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.
dc.contributor.author | Artus V. | |
dc.contributor.author | Durlofsky L.J. | |
dc.contributor.author | Onwunalu J. | |
dc.contributor.author | Aziz Kh. | |
dc.date.accessioned | 2024-09-04T09:55:51Z | |
dc.date.available | 2024-09-04T09:55:51Z | |
dc.date.issued | 2006 | |
dc.identifier | Artus V. and Durlofsky L.J. and Onwunalu J. and Aziz Kh. | |
dc.identifier.citation | Computational Geosciences, 2006, 10, 4, 389-404 | |
dc.identifier.uri | https://repository.geologyscience.ru/handle/123456789/44984 | |
dc.description.abstract | The determination of the optimal type and placement of a nonconventional well in a heterogeneous reservoir represents a challenging optimization problem. This determination is significantly more complicated if uncertainty in the reservoir geology is included in the optimization. In this study, a genetic algorithm is applied to optimize the deployment of nonconventional wells. Geological uncertainty is accounted for by optimizing over multiple reservoir models (realizations) subject to a prescribed risk attitude. To reduce the excessive computational requirements of the base method, a new statistical proxy (which provides fast estimates of the objective function) based on cluster analysis is introduced into the optimization process. This proxy provides an estimate of the cumulative distribution function (CDF) of the scenario performance, which enables the quantification of proxy uncertainty. Knowledge of the proxy-based performance estimate in conjunction with the proxy CDF enables the systematic selection of the most appropriate scenarios for full simulation. Application of the overall method for the optimization of monobore and dual-lateral well placement demonstrates the performance of the hybrid optimization procedure. Specifically, it is shown that by simulating only 10% or 20% of the scenarios (as determined by application of the proxy), optimization results very close to those achieved by simulating all cases are obtained. | |
dc.subject | advanced wells | |
dc.subject | cluster analysis | |
dc.subject | reservoir simulation | |
dc.subject | risk analysis | |
dc.subject | stochastic optimization | |
dc.subject | uncertainty management | |
dc.subject | well placement | |
dc.title | OPTIMIZATION OF NONCONVENTIONAL WELLS UNDER UNCERTAINTY USING STATISTICAL PROXIES | |
dc.type | Статья | |
dc.identifier.doi | 10.1007/s10596-006-9031-9 |
Files in this item
This item appears in the following Collection(s)
-
ELibrary
Метаданные публикаций с сайта https://www.elibrary.ru